Mapa topográfico Tenkiller Ferry Lake
Mapa interactivo
Haga clic en el mapa para ver la altitud.
Acerca de este mapa
The hydroelectric power station is remotely controlled from the control center at Fort Gibson Lake. Two generators, each rated for 17 megawatts, provide a total capacity of 34 megawatts (MWe). The facility can handle 40 MWe for a short period of time. However, the amount of power that can actually be generated depends heavily on the lake elevation at any given time.